Standard Operating Procedure for Engineering Preventive Maintenance

SOP Number: Engineering – 01

Department: Engineering and Maintenance

Date Issued: 01–Feb-2018

Time to Train: 45 Minutes

Engineering Preventive Maintenance Standard Procedure:

  • The main purpose of the preventive maintenance SOP is to reduce the downtime of all equipment used in the hotel by minimising mechanical failures, breakdown, operation and also its running cost.

  • In order to ensure that equipment is serviced according to the manufacturer's specifications a repair Log Data Sheet to be completed.

  • Each equipment or machinery is to be serviced in accordance with the manufacturer's specifications and the operating conditions.

  • All Preventive maintenance functions have to be entered on the Preventive Maintenance Weekly Schedule Sheets.

  • Preventive Maintenance (PM) Weekly Schedule Sheets have to be signed by the Engineering Supervisor / Chief Engineer.

  • The PM task needs to be also entered on the Repair Log Data Sheet.

  • From the Repair Log, compile a list of all equipment, respective equipment numbers, preventive maintenance functions and time intervals.

  • It is important that the workload is spread evenly over a 52 week period so that preventive maintenance is performed every week.

  • The number of spreadsheets required is determined by the property size and the number of pieces of equipment included within the preventive maintenance Schedule.

  • When the spreadsheets have been completed and reworked to maximise efficiency, the weekly Schedule Sheets to be completed.

  • Each piece of equipment to be serviced on week 1 is taken from the respective spreadsheet and entered on a Weekly Schedule Sheet.

  • Equipment name, identification number and specific maintenance functions to be performed are to be entered.

  • As each piece of equipment is completed, the employee enters his initials and the date of completion on the Preventive maintenance register.

  • Any additional work performed and/or needed is to be noted on the Sub-Master and a work request ticket written.

  • The completed Weekly Schedule Sheet is then returned to the Chief Engineer, along with any additional remarks.

  • The Chief Engineer is to review each returned Sub-Master sheet to ensure the Preventive Maintenance has been completed.

  • Chief engineer to note any additional work performed or work which requires scheduling at a later date.

  • Any work performed above and beyond Preventive Maintenance has to be entered in the Repair Log Record Sheet.

  • The preventive maintenance sheet has to be filed in a dated binder and retained for one year in the Engineering Office.

  • At the year-end, the binders have to be put in permanent storage and kept for legal purposes.

Training Summary questions:

Q1. What is the purpose of the Preventive maintenance SOP?

Q2. Why is it important to service the equipment as per the manufacturer’s specification?

Q3. Who is responsible for reviewing the weekly schedule sheet?

Q4. Explain the process of filing the PM log sheet?

Q5. Expalin the process of filing and storing preventive maintenance sheets? 



Setupmyhotel.com is build to help hoteliers setup their operations. Get sample Stationery, Formats, SOP's, Staff Training Tips, Job Descriptions and more.
See you around and happy Hoteliering..

Newsletter

Subscribe to our newsletter. Don’t miss on any posts.

We do not spam!