Standard Operating Procedure for Condenser Pump Maintenance

SOP Number: Hotel Engineering SOP – 15

Department: Engineering and Maintenance

Date Issued: 25–Feb-2018

Time to Train: 30 Minutes

Condenser Pump Maintenance Checklist and Procedure:

Required Tools:

  • Screwdriver.

  • Clamp meter.

  • Crimping Tool.

  • Megger.

  • Oil Can.

  • Grease Gun.

  • Plier.

  • Spanner Set.

  • Brush.

  • Bush.

  • Line Tester.

Consumable Parts:

  • PVC tape.

  • WD- 40.

  • Lubricating Oil.

  • Grease.

  • Carbon removing compound.

  • Old cleaning clothes.

Cooling Tower Fan Maintenance Activity:

Condenser Pump:

  • Check the alignment of the pump and the motor.

  • Check the shaft if the same is loose or broken.

  • Broken shaft to be removed immediately.

  • Check the bearing and if required do oiling or greasing.

  • Replace bearing if it is too noisy.

  • Check the bush if it is loose or broken.

  • Replace broken bush.

  • Check the coupling of the motor pump.

  • Check the but & bolts, tighten nut & bolts if required.

  • Check the impeller for loose & broken, replace if required.

  • Check strainer if it's broken, cleaning to be also done.

Motor:

  • Motor Should be of minimum 60 HP.

  • Electrical control should be proper.

  • Check for any burnt contact, loose electrical connection and overall operation to be checked.

  • Overload relay should be checked.

  • Check the operation of the relay, setting and loose electrical connections.

  • Check the timer operation and time settings.

  • Check for any loose electrical connection.

  • Check for any loose & burnt electrical connection.

  • Check the MCB rating and verify with the recommended Amp.

  • Check Terminal Plate, Any burnt and broken plate need to be replaced.

  • Check the motor bearing.

  • Perform oiling, greasing or change the bearing if required.

  • Check the internal Resistance Value.

Other points to check:

  • Check at the full Load motor capacity should be 85 Amp.

  • Check and verify the overload relay setting should be 40 Amp.

  • Check the contractor rating should be ML4 - 63 Amp.

  • Overload relay range should be between 30-50Amp.

  • Check and verify the control fuse rating at 4 Amp.

  • Check and verify the MCB rating should be at 250 Amp.

  • Check and verify the timer settings should be set at 9-10 sec.

Remarks by the Technician:

Date:

Signature:


Setupmyhotel.com is build to help hoteliers setup their operations. Get sample Stationery, Formats, SOP's, Staff Training Tips, Job Descriptions and more.
See you around and happy Hoteliering..

Newsletter

Subscribe to our newsletter. Don’t miss on any posts.

We do not spam!