Standard Operating Procedure for Double Door Cooling Cabinet Checklist

SOP Number: Hotel Engineering SOP  – 07

Department: Engineering and Maintenance

Date Issued: 16–Feb-2018

Time to Train: 30 Minutes

Double Door Cooling Cabinet Maintenance Checklist and Procedure:

Required Tools:

  • Screwdriver.

  • Plier.

  • Clamp.

  • Meter.

  • Wire Brush.

  • Crimping tool. 

  • Greasing Gun.

  • Oil Cane. 

  • Line Tester.

  • Spanner set.

  • Soap solution.

Consumable Parts:

  • PVC Tape.

  • Old clothes.

  • Carbon removing Compound.

  • Soap solution.

Maintenance Activity:

  • Condenser Motor - Check motor bush and shaft.

  • Compressor - Check if it is noisy and also the back pressure.

  • Check the Electrical controls.

  • MCB - Loose & Burnt electrical connection and rating of MCB to be checked.

  • Earthing - should be proper.

  • Extension cord - burnt, cut in wire to be checked.

  • Proper thimbling - burnt connections and thimbles to be checked.

  • Relays - operation of relays to check.

  • Electrical Loose connection to check.

  • Doors/Handles - Check if the handle is loose and also the operation.

  • Latch - operation to check.

  • Door gaskets - broken gasket and cooling leakage to be checked.

  • Cleaning - General cleaning to be done.

  • Condenser Fan - Loose & broken fan blade.

  • Check Temperature is between 4-6 Deg.C.

  • Check if the compressor on full Load should be 5 Amp. 

  • Check and verify that the MCB rating should be 20 Amp.

Remarks by the Technician:

Date:

Signature:


Setupmyhotel.com is build to help hoteliers setup their operations. Get sample Stationery, Formats, SOP's, Staff Training Tips, Job Descriptions and more.
See you around and happy Hoteliering..

Newsletter

Subscribe to our newsletter. Don’t miss on any posts.

We do not spam!