Standard Operating Procedure for Double Door Cooling Cabinet Checklist
SOP Number: Hotel Engineering SOP – 07
Department: Engineering and Maintenance
Date Issued: 16–Feb-2018
Time to Train: 30 Minutes
Double Door Cooling Cabinet Maintenance Checklist and Procedure:
Required Tools:
-
Screwdriver.
-
Plier.
-
Clamp.
-
Meter.
-
Wire Brush.
-
Crimping tool.
-
Greasing Gun.
-
Oil Cane.
-
Line Tester.
-
Spanner set.
-
Soap solution.
Consumable Parts:
-
PVC Tape.
-
Old clothes.
-
Carbon removing Compound.
-
Soap solution.
Maintenance Activity:
-
Condenser Motor - Check motor bush and shaft.
-
Compressor - Check if it is noisy and also the back pressure.
-
Check the Electrical controls.
-
MCB - Loose & Burnt electrical connection and rating of MCB to be checked.
-
Earthing - should be proper.
-
Extension cord - burnt, cut in wire to be checked.
-
Proper thimbling - burnt connections and thimbles to be checked.
-
Relays - operation of relays to check.
-
Electrical Loose connection to check.
-
Doors/Handles - Check if the handle is loose and also the operation.
-
Latch - operation to check.
-
Door gaskets - broken gasket and cooling leakage to be checked.
-
Cleaning - General cleaning to be done.
-
Condenser Fan - Loose & broken fan blade.
-
Check Temperature is between 4-6 Deg.C.
-
Check if the compressor on full Load should be 5 Amp.
-
Check and verify that the MCB rating should be 20 Amp.
Remarks by the Technician:
Date: